News

The National High Speed Rail Corporation Limited (NHSRCL), which is implementing the project, said platform level slab ...
In a significant milestone for the the Mumbai-Ahmedabad Bullet Train project, the track slab installation and Cement Asphalt ...
As part of a strategic Indo-Japanese partnership, Japan will gift two Shinkansen train sets — one each from the E5 and E3 ...
Ahmedabad High-Speed Rail (MAHSR) corridor spans approximately 508 km. The corridor will cross major hubs including Mumbai ...
The casting of the first slab at the upcoming Mumbai-Ahmedabad bullet train station at Virar in Palghar district of ...
The entire journey will be completed in about 2 hours 7 minutes with limited stops (at Surat, Vadodara and Ahmedabad), which ...
The Mumbai-Ahmedabad bullet train corridor is divided into two sections, with the Gujarat segment covering 348 km and the ...
India's first bullet train, Shinkansen - which will run on Ahmedabad-Mumbai corridor, has begun in Japan. India will receive ...
The Mumbai-Ahmedabad Bullet Train project has marked significant progress with the commencement of track slab installation ...
Virar Station, a key node on the Mumbai-Ahmedabad High-Speed Rail (MAHSR) corridor, is designed with two levels — the ...
BEML Bengaluru will start manufacturing India’s first bullet train prototype in September 2025. Speed trials up to 280 kmph ...